23 Jul Delivery of a contemporary villa
A look at the interior handover of a contemporary villa, where volumes, light and materials come together in harmony....
A look at the interior handover of a contemporary villa, where volumes, light and materials come together in harmony....
Our team has completed the hangar timber frame: the first Vaud building is weathertight, ahead of the roofing and cladding....
Greenparc Sion reaches a key milestone: the final phase is delivered. The first residents can move into this new sustainable neighbourhood of 191 apartments in Champsec....
Mature trees transplanted along the boundary, façade insulation and metal cladding, glazing and MEP services: an update on our HPE villas in Geneva....
On the Vaud site, the future hangar's slab takes shape: electrical conduits are laid and networks positioned ahead of the concrete pour....
The construction site of the three contiguous HPE villas in Geneva reaches an important milestone. With the structural works and timber framing now complete, the tower crane that overlooked the site has been dismantled. A high-capacity telescopic mobile crane was brought in to remove it...
The year 2025 is a milestone for Valais real estate. The first phase of Greenparc Sion is now complete. It is the largest residential construction site in the canton. This major achievement is highlighted in the 2025 edition of Construction & Bâtiments magazine. This reference publication...
Located in the Champsec district of Sion, Greenparc is part of a major urban renewal initiative, transforming a former industrial site into a vibrant residential hub. The project consists of eight buildings comprising 191 apartments, from studios to 4.5-room units, all designed to meet high...
In the heart of a green environment in Geneva, three HPE houses (High Performance Energy) are under construction. This project shows how technical precision can meet spatial poetry. The concrete cores rise from the ground as vertical anchors in the natural slope. These strong elements form...
Excavation reception and raft foundation reinforcement In Pregny-Chambésy, CSDK Architectes is supervising two projects carried out simultaneously with the general contractor Veyrat-Sarasin: the construction of three adjoining villas (ANEA project) and a housing building (BETH project). The excavation works have been completed, while insulation installation and raft...
At 2000 meters, CSDK Architectes delivers an alpine distillery shaped by raw materials and silence. Concrete, corten steel and wood define a space embedded in the terrain. Designed as a discreet volume, the building channels alpine spring water to power the distillation process. Light enters sparingly,...
Located on Rue du Rhône, the @pomellato jewelry boutique recently underwent a transformation that combines elegance with environmental responsibility. Under the supervision of CSDK as architectural director and coordinator, the space was redesigned using noble materials, bringing a warm and refined atmosphere to the boutique....
Set on a site with pronounced topography and lush vegetation, these three high energy performance (HPE) villas take full advantage of the landscape to propose an architecture that is both contextual and integrated. The project is structured around two main axes: the site’s natural slope and...
Revival of a 19th-Century House in Puplinge In the heart of the village, a historic building is regaining its authenticity. Stripped of superfluous additions, its structure has been reinforced, and its original materials have been carefully restored....
Nestled in the heights of the village of Bursinel, the project is located on a greenfield site with a narrow, longitudinal typology and a steep, irregular slope. Situated more than a metre above the access road, the site stands out from its immediate surroundings, reinforcing...
The project in Sion aimed at creating 200 housing units, including an underground parking facility, is currently in the structural work phase....
Construction work on the Rue des Pâquis building is progressing well. The old flats have been completely demolished, enabling the existing structure to be reinforced and work to begin on installing new mixed wood-concrete slabs or, as required, concrete-only slabs. Once the structural work has...
A new project under way in a residential area. Contemporary architecture taking shape in the heart of an environment of villas....
In the heart of the mountains, the chalet rises...
Renovation work on a 10-apartment building is progressing according to plan. Two thirds of the basement invert has been completed. Scaffolding has been erected. Soon, the old apartments will be demolished. Then the new floor slabs will be laid. This complete renovation will completely modernize...